West Weber LDS Church Parking Lot Expansion

Address:
4080 West 900 South, West Weber, UT, 84404
Maps:
Project Type:
Design Reviews
Sub Type:
Design Reviews
Created By:
Created On:
2/6/2012
Project Status:
Submitted
Status Date:
6/18/2012
File Number:
DR 2012-09
Project Manager

Application


Property Address
4080 West 900 South
West Weber, UT, 84404

Property Owner

--

Representative

--

False
0
4
,

Parcel Number

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Building Elevations
Engineered Plans
Landscaping Plan
Narrative
Notice of Decision
Other
Review Staff_Report_and_Exhibits.pdf 6/18/2012
Original Staff_Report_Administrative_Approval.pdf 6/18/2012
Original Irrigation_Details.pdf 6/15/2012
Original Irrigation_Details-1.pdf 6/15/2012
Original Planting_Details.pdf 6/15/2012
Original Irrigation_Plan.pdf 6/15/2012
Original Detail_Sheet-1.pdf 6/15/2012
Original Planting_Sheet.pdf 6/15/2012
Original SWPPP_Details.pdf 6/15/2012
Original SWPPP_Details-1.pdf 6/15/2012
Original Detail_Sheet.pdf 6/15/2012
Original Grading_and_Drainage_Plan.pdf 6/15/2012
Original Const._Site_Storm_Water_Management.pdf 6/15/2012
Original Sheet_Title_Plan.pdf 6/15/2012
Original Storm_Water_Study.pdf 6/15/2012
Original Horizontal_Control_Plan.pdf 6/15/2012
Original Demolition_Site_Plan.pdf 6/15/2012
Original General_Notes_Legend_Abbreviations.pdf 6/15/2012
Original Cover_Sheet.pdf 6/15/2012
Original approved_SWCAP-1.pdf 6/15/2012
Original approved_SWCAP.pdf 6/1/2012
Review West_Weber_LDS_Church_email.pdf 5/30/2012
Original LDS_WEST_WEBER_1_2_3_.pdf 5/4/2012
Original Unapproved_Stormwater_Construction_Permit.pdf 5/4/2012
Original New_Preliminary_Plan.pdf 4/5/2012
Original Storm_Calculations.pdf 2/6/2012
Original Site_Plan.pdf 2/6/2012
Outdoor Lighting Plan
Planning Staff Report
Signage Plan
Site Plan
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

N/A - 6/8/2012
Excavation permit was issued to Geneva today for this project
N/A - 5/4/2012
I received a new set of plans via email from The McNeil Group which I have uploaded to Miradi.
N/A - 4/6/2012
Kelly's crew will be cleaning out that catch basin this afternoon. He said a 6" pipe connects all the boxes on that street.
N/A - 4/5/2012
I just spoke to Kelly, he will go look at the catch basin and clean it if necessary.
N/A - 4/5/2012
I received a new preliminary plan from McNiel Engineering via email this morning and uploaded it Miradi
N/A - 4/4/2012
I spoke to Rod Davis at McNiel Engineering this morning. The church has changed some things on the site so Rod will be sending me a new plan to see what they need to do now. He also mentioned the catch basin they are intending to tie into appears to be full of debris and clogged. I will have Kelly run take a look at it and clean it if necessary.
Summer Day - 3/8/2012
Information was provided to our office on March 8, 2012 by the McNeil Group showing the LDS church house as being connected to a sanitary sewer system. The church has a 4” sewer line connecting to a sewer lateral located on 4100 W (north south orientation). Therefore approval from our office is not necessary for the development of this property

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Planning Division Staff Report

Approved

Weber County Community Development Sean Wilkinson 6/18/2012
Engineering Review 3

Approved

N/A N/A 5/30/2012
Engineering Review 2

Not Approved

N/A N/A 5/16/2012
Engineering Review 2

Not Approved

N/A N/A 4/9/2012
Engineering Review 1

Not Approved

N/A N/A 2/15/2012

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options
Summer Day 1/1/0001
Justin Morris 1/1/0001
Melissa Smith 1/1/0001

Payments

List of all invoices tied to project.