Cobble Creek RCMP Water System Improvements

Address:
1900 & 2306 North Weber County Road 195, Huntsville, UT, 84317
Project Type:
Conditional Use Permits
Sub Type:
Conditional Use Permits
Created By:
Created On:
4/23/2015
Project Status:
Approved
Status Date:
6/4/2015
File Number:
CUP 2015-13
Project Manager

Application

The application is for the improvement of the water system for the Cobble Creek RCMP (Recreational Camp & Mountain Property).  These improvements will consist of the following: spring rehabilitaion, instalation of two new 5,000 gallon under ground storage water tanks and a solar powered disinfection system, modifications to the existing water distribution system (including waterlines and hydrants) and infrastructure.  Additional improvements will include construction of a new spring access road and upgrading the restroom/shower facility.  The new building will be 35'4" x 19'4" and consist of 6 toilets, 7 showers and sinks/hand washing facilities on both the east and west ends of the building.  The restroom/shower facility building will include installation of a new septic system.  


Property Address
1900 & 2306 North Weber County Road 195
Huntsville, UT, 84317

Property Owner

--

Representative

--

False
0
27
,

Parcel Number
230190003 - County Map

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Building renderings
Easement documents
Engineered Plans
Geologic hazards study
Geotechnical report
Landscaping Plan
Narrative
Notice of decision
Other
Original Signed_CUP.pdf 6/10/2015
Original 5-28-15_Cobble_Creek_CUP_Decision_Letter.pdf 5/28/2015
Review 5-28-15_Cobble_Creek_CUP_Decision_Letter.pdf 5/28/2015
Review 5-15-15_Cobble_Creek_staff_report_maps_and_exhibits.pdf 5/20/2015
Review 5-15-15_Cobble_Creek_CUP_Staff_Report.pdf 5/20/2015
Original 5-15-15_Cobble_Creek_staff_report_maps_and_exhibits.pdf 5/20/2015
Original 5-15-15_Cobble_Creek_CUP_Staff_Report.pdf 5/20/2015
Original CUP_2015-13_Cobble_Creek_RCMP_Drawings.pdf 4/23/2015
Original CUP_2015-13_Cobble_Creek_Response_to_DDW_Comments.pdf 4/23/2015
Original CUP_2015-13_Cobble_Creek_RCMP_Site_Map.pdf 4/23/2015
Original CUP_2015-13_Cobble_Creek_RCMP_floor_plan.pdf 4/23/2015
Original CUP_2015-13_Cobble_Creek_DWR_application.pdf 4/23/2015
Original Corp_of_Engineers_Application.pdf 4/23/2015
Original CUP_2015-13_Cobble_Creek_C102.pdf 4/23/2015
Original CUP_2015-13_Cobble_Creek_RCMP_application.pdf 4/23/2015
Original CUP_2015-13_Cobble_Creek_C101.pdf 4/23/2015
Permits issued
Planning staff report
Signage Plan
Site Plan
Time Extension
Water and Wastewater Plan
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

Dana Shuler - 6/10/2015
A discrepancy was found between the water system design and the restroom building design (building permit). I sent an email to John Simmons stating such and asked him to re-coordinate with architect.
Summer Day - 5/1/2015
An onsite wastewater plan/ septic plan has been reviewed and approved. At this time a legal address is required to issue a permit

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Conditional Use Permit

Approved

N/A N/A 6/10/2015
Notice of Decision

Approved

N/A N/A 5/28/2015
Planning Division Staff Report

Approved

N/A N/A 5/20/2015
Engineering Review 1

Approved

Dana Shuler 5/15/2015
Environmental Health drinking water

Approved

Weber-Morgan Health Department Summer Day 5/1/2015
Weber Fire Comments

Approved

N/A N/A 4/28/2015

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options
Summer Day 1/1/0001
Dana Shuler 1/1/0001
John Simmons 1/1/0001

Payments

List of all invoices tied to project.