SAL Peery Camp

Address:
95 Ogden Canyon, Ogden, UT, 84401
Project Type:
Conditional Use Permits
Sub Type:
Conditional Use Permits
Created By:
Created On:
10/14/2011
Project Status:
Rejected
Status Date:
9/17/2014
File Number:
CUP 2011-6
Project Manager

Application

Verizon Wireless is proposing to install an unmanned communication facility consisting of antennas mounted to a new 85' tall monopine with equipment located inside a new 12' x 26' prefabricated equipment building enclosed with a six foot tall chain link fence with three strands of barbed wire. 

 

Some changes have been made to the design and site plan location for this proposed cell site. With the new location, the pole type will be a 50 foot monopole. Please refer to the new plans as of Sept. 2012.


Property Address
95 Ogden Canyon
Ogden, UT, 84401

Property Owner

--

Representative

--

False
0
,

Parcel Number
130750006 - County Map

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Building renderings
Easement documents
Engineered Plans
Geologic hazards study
Geotechnical report
Landscaping Plan
Narrative
Notice of decision
Other
Original Time_Extension_Notice_of_Decision.pdf 12/19/2013
Original SAL_Peery_Camp_extension_of_time.pdf 12/10/2013
Original Notice_of_Decision.pdf 1/18/2013
Original Final_Site_Plans.pdf 11/26/2012
Original NEPA_Letter_Peery_Camp.pdf 9/18/2012
Original Site_Plan_with_photo.pdf 9/18/2012
Original Site_Plan.pdf 9/18/2012
Original Prelim_Site_Plan.pdf 9/18/2012
Original SAL_PEERY_CAMP_Drawings_set_2.pdf 1/12/2012
Original Sal_Peery_Camp_-_Final_PS_2b.jpg 12/7/2011
Original Sal_Peery_Camp_-_Final_PS_1b.jpg 12/7/2011
Original CIMG0382.jpg 10/24/2011
Original CIMG0381.jpg 10/24/2011
Original CUP_2011-06_Sal_Perry_Camp_Site_Plan.pdf 10/14/2011
Original CUP_2011-06_Sal_Peery_Camp_Application.pdf 10/14/2011
Permits issued
Planning staff report
Signage Plan
Site Plan
Time Extension
Water and Wastewater Plan
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

N/A - 9/17/2014
This project has expired.
N/A - 12/10/2013
A request has been made for a 6 month time extension with the Ogden Valley Planning Commission December 17, 2013 at 5:00 p.m.
Chad Meyerhoffer - 12/10/2012
With the new plans submitted on November 26th, I do not have any additional comments in addition to the Engineering review that was posted on September 19th 2012.
N/A - 11/26/2012
To all reviewer's on this project. A latest set of plans have come for this and are available for review. Please note that the alterations in the plan are mostly due to aesthetics and design of the screening. If you want to make further comments please do so.
N/A - 8/1/2012
This project is on hold until the applicant can find a new location for the utility on the property.
N/A - 1/17/2012
A planning review has been added 1-17-2011 as some item have not been adequately addressed. This item was postponed from the 1-24-2012 Ogden Valley Planning Commission meeting agenda.
N/A - 1/12/2012
New site plan drawings were uploaded on 1-12-2012. Please review updates for compliance to agency requirements.
N/A - 1/6/2012
Visited the site on 1-4-2012 to see historic remains of a lime stone kiln shown on photos in Engineering's review. Below the site there appears to be evidence of two kilns made of red brick. The applicant has been notified of this visit.

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Planning Divison Staff Report

Approved

N/A N/A 12/20/2013
Planning Division Staff Report

Approved

N/A N/A 12/6/2012
Engineering

Not Approved

Weber County Engineering Chad Meyerhoffer 9/19/2012
Planning Division Staff Report

Not Approved

N/A N/A 9/18/2012
Staff Report to the Ogden Valley Planning Commission

Not Approved

N/A N/A 2/22/2012
Planning Review

Not Approved

N/A N/A 1/17/2012
Engineering

Not Approved

Weber County Engineering Chad Meyerhoffer 1/17/2012
Fire Review

Approved

Weber Fire District Ted Black 12/8/2011
Fire Review

Approved

Weber Fire District Ted Black 10/31/2011
Engineering

Approved

Weber County Engineering Chad Meyerhoffer 10/24/2011
Building Inspection Review

Approved

Craig Browne 10/17/2011

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options
Ted Black 1/1/0001
Craig Browne 1/1/0001
doug kofford 1/1/0001
Doug Kofford 1/1/0001
Chad Meyerhoffer 1/1/0001

Payments

List of all invoices tied to project.