Ratchford-Davy-Design Reviews (ChairLift)

Address:
3925 E Snowbasin Road, Huntsville, UT, 84317
Project Type:
Design Reviews
Sub Type:
Design Reviews
Created By:
Created On:
6/18/2021
Project Status:
Approved
Status Date:
8/3/2021
File Number:
DR 2021-10
Project Manager

Application

Snowbasin Resort is requesting Design Review approval to replace the Middle Bowl chairlift. The original fixed grip triple Middle Bowl lift manufactured by CTEC in 1979 will be replaced with a 6 passenger detachable chairlift designed and manufactured by Leitner Poma of America. The installation will have a slope length of 4,600 feet with an elevation gain of 1,170 feet and an average slope of 27%. The construction of the lift will be entirely on land owned by the United States Forest Service and utilized by the resort under its Special Use Permit. The new bottom terminal will be approximately 200 feet northwest of the original bottom terminal and the new top terminal will be approximately 400 feet southwest of the original top terminal.

Property Address
3925 E Snowbasin Road
Huntsville, UT, 84317

Property Owner
Davy Ratchford
801-821-6169
dratchford@snowbasin.com

Representative

--

False
F-40
0
Not Applicable
Not Applicable
Not Applicable
Owner, Davy Ratchford

Parcel Number
230040001 - County Map
230010001 - County Map

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Building Elevations
Revision Middle Bowl D6C - Bottom Terminal Grading Plan June 29.pdf 7/8/2021
Revision Middle Bowl D6C Top Terminal Grading Plan - Revision 2 - June 28.pdf 7/8/2021
Engineered Plans
Revision Middlebowl - RETURN TERMINAL FOUNDATION.pdf 7/8/2021
Revision Middlebowl - DRIVE TERMINAL FOUNDATION.pdf 7/8/2021
Revision Middlebowl Profile.pdf 7/8/2021
Landscaping Plan
Revision Geologic Review.pdf 7/26/2021
Revision MiddleBowlLiftReplacement_SWPPP.pdf 7/16/2021
Narrative
Notice of Decision
Other
Revision SWCAP-Chairlift.pdf 7/12/2021
Revision Snowbasin Middle Bowl Preliminary Lift Calculation Submission.pdf 6/24/2021
Revision Receipt.pdf 6/22/2021
Outdoor Lighting Plan
Planning Staff Report
Revision signed staff report.pdf 8/3/2021
Signage Plan
Site Plan
Revision Middle Bowl - D6C - Top Terminal Grading Plan June19.pdf 6/28/2021
Original Middle Bowl - Lift Alignment Plan June 19.pdf 6/21/2021
Original 2021-05-28 Middle Bowl - Bottom Terminal - C2d.pdf 6/21/2021
Original Middle Bowl - D6C - Top Terminal Grading Concept 3c (006).pdf 6/21/2021
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Engineering Review #2

Approved

Weber County Engineering Ashley Thoman 7/20/2021
Planning Review

More Information Needed

Public Steve Burton 7/2/2021
Engineering Review #1

More Information Needed

Weber County Engineering Ashley Thoman 7/1/2021
Fire Review

Approved

Weber Fire District David Reed Weber Fire District 6/28/2021

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options
Ben Ahern 7/8/2021
Eric Ahern 6/18/2021
Marta Borchert 6/21/2021
Steve Burton 6/21/2021
Peter Landsman 7/1/2021
Ashley Thoman 6/24/2021
Libby Watson 6/24/2021
David Reed Weber Fire District 6/24/2021

Payments

List of all invoices tied to project.