Parcel Number |
---|
15090001 - County Map |
Building Description | Square Feet | Valuation |
---|
Contractor Type | Name | Contact | Address |
---|
List of project documents. Review documents can be found under the Review tab.
Document Name | Date Uploaded |
Options
|
|
---|---|---|---|
Annexation Plat | |||
Original 2023.09.29 23-RE-083 Trevor Bennett_PRELIMINARY SUB.pdf | 2/28/2024 | ||
Original 2023.09.29 23-RE-083 Trevor Bennett_PRELIMINARY ROS (1).pdf | 2/28/2024 | ||
Application | |||
Attestation | |||
Cost Estimate | |||
Culinary Water Will-Serve | |||
Revision TWWWsharp_20240705_134902.pdf | 7/8/2024 | ||
Original TWWWsharp_20231016_120715.pdf | 2/28/2024 | ||
Engineered Plans | |||
Original Trevor Bennet 3-25-24.pdf | 4/10/2024 | ||
Original House Plans Engineering 2.pdf | 4/10/2024 | ||
Original House Plans Engineering 1.pdf | 4/10/2024 | ||
Final Recorded Plat | |||
Revision 23-RE-083 Trevor Bennett_ROS.pdf | 7/8/2024 | ||
Geologic Hazards Evaluation | |||
Geotechnical Evaluation | |||
Notice of Decision | |||
Open Space Preservation Plan | |||
Other | |||
Revision Road Suggestions.pdf | 7/8/2024 | ||
Preapplication Meeting Notes | |||
Original Planning Meeting Notes.pdf | 2/28/2024 | ||
Proposed Final Plat | |||
Proposed Preliminary Plan | |||
Public Street Connectivity Plan | |||
Original Planning Meeting Notes.pdf | 2/28/2024 | ||
Receipt | |||
Response to Review Agencies | |||
Secondary Water Will-Serve | |||
Original Berrett, etal Subdivision Preliminary Will Serve June 2024.pdf | 6/12/2024 | ||
Septic Feasibility | |||
Original Health Dept Letter of Feasability.pdf | 6/5/2024 | ||
Sewer Will-Serve | |||
Staff Report | |||
Time Extension | |||
Title Report | |||
Original Title Report.pdf | 6/19/2024 | ||
Traffic Study/Plan | |||
Well Approval | |||
Uncategorized Documents |
To access review documents, click on the individual review and the corresponding review documents will be listed under the review.
All followers will be notified of new documents, comments, and reviews to the project.
Name | Date Added |
Options
|
---|---|---|
Trevor Bennett | 7/20/2023 | |
Marta Borchert | 6/19/2024 | |
Bridger Curtis | 7/16/2024 | |
Shaun Rose | 7/16/2024 | |
Darrel Woodruff | 7/16/2024 |
List of all invoices tied to project.
List of estimated fees for this project.
Comments
Have a question? Leave a comment, your comment will be emailed to all project followers.
Hi Tammy,
I also just uploaded an image regarding the right of way/future roads we discussed. As I mentioned on our call, Allen Berrett and I met with Steve Burton and Gary Myers on site last fall and discussed this topic with them in person. They told us that ultimately where the roads go is up to you all at the planning department but that we would have an opportunity to make our preferences known and it is something we could potentially work with you all on. The image I uploaded would be Mr. Berrett's preferences for the future roads, as we feel they are the least intrusive to his land and also the most logical and economical for construction. The red line would be Mr. Berrett's ideal choice (running 2750 S west until the canal and then turning diagonally southwest and running alongside the canal until the road meets 4300). Please just let me know if there is anything else we can do or if this is something you'd like to discuss further with myself and Mr. Berrett. Thank you.
Hi Tammy,
Thanks for giving me a call the other day and working through the issues you brought up. Glad we are able to move forward with a lot average subdivision. I've uploaded a new will serve letter for culinary water and have also uploaded what I think is the final plat recording as you had mentioned. Please just let me know if that is what you are looking for or if I need to get anything else from our Surveyor. Thanks again!
This application does not meet minimum requirement for Weber County Planning. The will-serve from Taylor West Weber Water needs to be updated. Submitted letter expired in January of 2024. The submitted plat does not show proposed lots meeting minimum standards of 40,000 square feet in area (0.92 acres) and a minimum of 150 width along a right-of-way.
Per previous discussions with the applicant, additional right-of-way connecting Wayment to 2750 South Street may be required. A pre-application meeting for this proposal is encouraged because previous discussions with the property owner did not include this proposed layout. Also, when submitting a proposed final plat, all structures within the proposed subdivision boundary shall be shown on the plat, along with distances to lot boundaries. This is to ensure that minimum setbacks are met for the A-1 zone.