A request for an addition to the General Store (Restaurant) in Eden has been made by the owner. The project would cover and enclose an outdoor seating area at the existing brick court yard/patio. This enclosed addition will seperate this area with walls, doors, and removeable windows which could be removed during the summer season.
This application is an amendment to an application (DR-2012-05) which covered this court yard area and attaching it to the building. Applicant will install windowsna dexiswting opeings to be removed furing summer season and replace existing entries.
Parcel Number |
---|
220510079 - County Map |
Building Description | Square Feet | Valuation |
---|
Contractor Type | Name | Contact | Address |
---|
List of project documents. Review documents can be found under the Review tab.
Document Name | Date Uploaded |
Options
|
|
---|---|---|---|
Building Elevations | |||
Engineered Plans | |||
Landscaping Plan | |||
Narrative | |||
Notice of Decision | |||
Other | |||
Original DR_05-2012_Rivised_site_plan_for_patio_cover.pdf | 3/6/2013 | ||
Original DR_2012-05_Amended_Patio_Cover_in_Court_Yard_at_2200_N_5500_E_Eden_UT.pdf | 2/6/2013 | ||
Original DR05-2012_Ben_Toone.pdf | 4/20/2012 | ||
Original rafter_drawing_for_patio_cover.pdf | 4/11/2012 | ||
Original Cover_patio_Drawing.pdf | 4/11/2012 | ||
Original Rock_Toone_cover_Structure_Admin_Approval.docx | 4/11/2012 | ||
Original DR2012-05_Patio_Cover_in_Court_Yard.pdf | 4/11/2012 | ||
Original General_Store_site_plan.pdf | 4/11/2012 | ||
Outdoor Lighting Plan | |||
Planning Staff Report | |||
Signage Plan | |||
Site Plan | |||
Uncategorized Documents |
To access review documents, click on the individual review and the corresponding review documents will be listed under the review.
DR 05-2012 revised site plan |
Approved |
Jim Gentry | 3/6/2013 | |
Environmental Health Septic |
Approved |
N/A | N/A | 2/14/2013 |
Environmental Health Septic |
Not Approved |
N/A | N/A | 2/8/2013 |
Administrative Approval |
Approved |
Jim Gentry | 4/20/2012 | |
Engineering (Conditional) |
Approved |
Michael Tuttle | 4/17/2012 | |
Building Inspection Review |
Approved |
Craig Browne | 4/11/2012 |
All followers will be notified of new documents, comments, and reviews to the project.
Name | Date Added |
Options
|
---|---|---|
Craig Browne | 1/1/0001 | |
Jim Gentry | 1/1/0001 | |
Ben Toone | 1/1/0001 | |
Michael Tuttle | 1/1/0001 |