Gravel Pit - Western Zirconium

Address:
10000 W 900 S, Ogden, UT, 84405
Project Type:
Conditional Use Permits
Sub Type:
Conditional Use Permits
Created By:
Created On:
5/3/2012
Project Status:
Approved
Status Date:
5/15/2012
File Number:
CUP 2012-03
Project Manager

Application

Aggregate processing plants separate mined or imported material into different individual sizes or a combination of sizes for use in materials like concrete, asphalt, road base, and fill material.  In general, this sorting processis accomplished through the use of a combination of five main types of equipment; feeders (grizzly and/or tunnel), curshers, screens, transfer conveyors, and stacking conveyors or stackers.  The primary purpose of hte feeders is to remove oversized material (typically larger than 5 inces in diameter) and to feed the remaining material into the plant at a constant rate.  Crushers (cone, impactor, or jaw types) reduce oversized material into smaller sizes for processing in the screens.  The screens separate the material into different sizes, depending on the number of decks.  Screens typically have either one, two, or three decks which allow the material to be sorted into two, three, or four different sieve sizes, respectively.  In some cases, multiple screen decks are used to make fewer size separations but at a higher production rate by distributing the material over a larger area of screening media.  Transfer conveyors are used to efficiently move the material from one piece of equipment or area of the plant to another, and the stackers are used to stack the resulting sorted or blended materials into stockpiles.  Because of the varied use and size of each aggregate facility, there is no one specific process train for every plant.


Property Address
10000 W 900 S
Ogden, UT, 84405

Property Owner

--

Representative

--

False
0
10
,

Parcel Number
100390004 - County Map

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Building renderings
Easement documents
Engineered Plans
Geologic hazards study
Geotechnical report
Landscaping Plan
Narrative
Notice of decision
Other
Original 10252013.pdf 11/7/2013
Original notice_of_decision_CUP_2012-03.pdf 6/13/2012
Original 2012-05-21_Letter_from_Utah_DNR_DOGM.pdf 5/24/2012
Original Western_Zirconium_Pit_Map_11x17_2_1.pdf 5/3/2012
Original Western_Zirconium_Pit_Map_Base_Map_1.pdf 5/3/2012
Original Western_Zirconium_Pit_Map_Finished_Grade_1.pdf 5/3/2012
Original Example_Layout.pdf 5/3/2012
Original FDCP_Western_Zirconium.pdf 5/3/2012
Original Western_Zirc_1.pdf 5/3/2012
Original Western_Zirc_2.pdf 5/3/2012
Original Western_Zirconium_Form_15a.pdf 5/3/2012
Original Small_Mine_Reclamation_Contract_App._-_Western_Zirc..pdf 5/3/2012
Original Bond_-_Notice_of_Intention_-_Western_Zirc..pdf 5/3/2012
Original Bond_Form.pdf 5/3/2012
Original Small_Mine_Contract_WZ.pdf 5/3/2012
Original Conditional_Use_Permit_Application.pdf 5/3/2012
Permits issued
Planning staff report
Signage Plan
Site Plan
Time Extension
Water and Wastewater Plan
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

Michael Tuttle - 10/24/2013
As long as the DOGM is fine with the reclamation then we are fine with it. They are the division that is holding the escrow for reclamation.
N/A - 7/9/2012
The CUP permit was issued today to the applicant.

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Planning Review

Approved

Jim Gentry 7/9/2012
Engineering

Approved

Michael Tuttle 6/25/2012
2012-3 Western Zirconium gravel pit

Approved

Jim Gentry 6/13/2012
Weber Fire District Review

Approved

Weber Fire District Ted Black 5/31/2012
Engineering

Not Approved

Michael Tuttle 5/17/2012
Building Inspection Review

Approved

Craig Browne 5/22/2012

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options
Ted Black 1/1/0001
Craig Browne 1/1/0001
Michael Edwards 1/1/0001
Jim Gentry 1/1/0001
Michael Tuttle 1/1/0001

Payments

List of all invoices tied to project.