Pineae Greenhouses Addition

Address:
1901 S 5100 W, Ogden, UT, 84401
Project Type:
Design Reviews
Sub Type:
Design Reviews
Created By:
Created On:
10/31/2013
Project Status:
Approved
Status Date:
11/20/2013
File Number:
DR2013-11
Project Manager

Application

Four additional buildings are proposed as well as a change in planting and growing areas for an existing wholesale nursery and greenhouse. 


Property Address
1901 S 5100 W
Ogden, UT, 84401

Property Owner

--

Representative

--

False
0
83
,

Parcel Number
150810031 - County Map

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Building Elevations
Engineered Plans
Landscaping Plan
Narrative
Notice of Decision
Other
Review PINEAE_SITE_PLAN_2-_WEBER_FIRE_DISTRICT_REVIEWED-12-11-13.pdf 12/11/2013
Review CPR_2-_Pineae_Greenhouse_Addition_1901_S_5100_W_Ogden.pdf 12/11/2013
Original Notice_of_Decision.pdf 11/20/2013
Review DR_2013-11_Greenhouse_Addition_Exhibits.pdf 11/20/2013
Review Photo.jpg 11/20/2013
Review SITE_PLAN.pdf 11/20/2013
Review Pineae_SITE_PLAN--WEBER_FIRE_DISTRICT_REVIEWED.pdf 11/8/2013
Review CPR-_Pineae_Greenhouse_Addition_1901_S_5100_W_Ogden.pdf 11/8/2013
Original SITE_PLAN.pdf 11/4/2013
Original DR_2013-11_Greenhouse_Addition_Exhibits.pdf 10/31/2013
Original DR_2013-11_Greenhouse_Addition_Application.pdf 10/31/2013
Outdoor Lighting Plan
Planning Staff Report
Signage Plan
Site Plan
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

N/A - 12/11/2013
I met with Brian at his office this afternoon concerning the project. Brian indicated that the only change that was taking place to the site was the addition of hoop housed located on the site where building 6 and 7 are indicated. I asked Brian to contact Ben and Rochelle directly to determine what they needed to finish the review process.
N/A - 12/3/2013
The new site plan appears to be the same as the previous one. The date still shows 2005 and the sheet lists 2 of 5. I reviewed the exhibit, which indicated the company's plans to better service Lowes. In order to complete this review, please ensure that the comments listed on the previous review are addressed on the site plan. If there are questions, please feel free to contact me direct. Brandon- 801-782-3580
N/A - 11/20/2013
A notice of decision has been posted.
N/A - 11/5/2013
The Septic System is shown on the plan just South of the office. It was completed and inspected in 2005. It is shown as (Trial Beds/No Structure) over Septic Tank. We have an above ground mound system. Also, a comment was asked by the engineer concerning the date on the plan. This was an oversight and the date is this week. Please let me know what else you need? Thanks-Brian Gold
N/A - 11/5/2013
The existing Mound septic system and future replacement area must be shown on the plan. Health Department would not have issue signing off on this once these items are addressed.
N/A - 11/4/2013
A site plan has now been submitted for review.
N/A - 11/1/2013
A site plan must be submitted in order for me to do a proper review.

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Weber Fire District Review - 2

Approved

N/A N/A 12/11/2013
Staff Report to Planning Commission

Approved

N/A N/A 11/20/2013
Weber Fire District Review

Not Approved

N/A N/A 11/8/2013
Engineering Review 1

Not Approved

N/A N/A 11/5/2013