The 240 foot diameter Thickener TH001 rake and drive mechanism requires replacement. They will also be updating switch gears, vista switches, transformers, pumps, adding a 900 square foot control building, a 40,000 gallon mix tank, water flow pumps, over flow tank and pumps, as well as a new 3 foot access bridge on a existing tank. I met with Mr. Lloy this morning and the tank diameter is actually 18 feet and not 240 feet as note else where. they have an existing Site Polution Prevention Plann I asked for them to send us a copy to put with the file for record puposes. i still recomend the project for approval. I believe rochelle is acking as Project manager for the construction permit. Blane Frandsen
Parcel Number |
---|
100320004 - County Map |
Building Description | Square Feet | Valuation |
---|
Contractor Type | Name | Contact | Address |
---|
List of project documents. Review documents can be found under the Review tab.
Document Name | Date Uploaded |
Options
|
|
---|---|---|---|
Building renderings | |||
Easement documents | |||
Engineered Plans | |||
Geologic hazards study | |||
Geotechnical report | |||
Landscaping Plan | |||
Narrative | |||
Notice of decision | |||
Other | |||
Original signed_admin_aproval_letter.pdf | 10/17/2014 | ||
Review CPR-_GSL_Minerals_Thickener_765_N_10500_W_Weber_County.pdf | 10/16/2014 | ||
Original CUP_2014-27_Drawings.pdf | 10/9/2014 | ||
Original CUP_2014-27_Thickener_TH001_Replacement_Application.pdf | 10/9/2014 | ||
Permits issued | |||
Planning staff report | |||
Signage Plan | |||
Site Plan | |||
Time Extension | |||
Water and Wastewater Plan | |||
Uncategorized Documents |
To access review documents, click on the individual review and the corresponding review documents will be listed under the review.
Weber county Building Inspections |
Approved |
Weber County Building Inspection | Stan Berniche | 12/9/2014 |
Administrative Approval |
Approved |
Jim Gentry | 10/17/2014 | |
Weber Fire District Review |
Approved |
N/A | N/A | 10/16/2014 |
Project CUP |
Approved |
Blane W Frandsen | 10/16/2014 |
All followers will be notified of new documents, comments, and reviews to the project.
Name | Date Added |
Options
|
---|---|---|
Stan Berniche | 1/1/0001 | |
Blane W Frandsen | 1/1/0001 | |
Jim Gentry | 1/1/0001 | |
Brian Lloyd | 1/1/0001 |