Ali Farms-Zoning Map Amendments

Address:
800 South 4700 West, Taylor, UT, 84404
Project Type:
Zoning Map Amendments
Sub Type:
Zoning Map Amendments
Created By:
Created On:
6/15/2023
Project Status:
Accepted
Status Date:
7/27/2023
File Number:
ZMA2023-13 - WW
Project Manager

Application

Ali Farms

Property Address
800 South 4700 West
Taylor, UT, 84404

Property Owner
Phil Holland
801-668-1565
Phil@hgroupventures.com

Representative
Trek Loveridge
801-824-8768
trekloveridge@gmail.com

False
A-1
73
15,000 AVG
Bona Vista Water Improvement District
Hooper Irrigation Company
Central Weber Sewer
Owner, Phil Holland

Parcel Number
150800032 - County Map

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Application
Concept Plan
Original 2023.06.15_Zoning Exhibit.pdf 6/15/2023
Draft Plans and Maps
Executed Documents
Revision Ordinance 2024-09 Amending County Land Use Map to Change Certain Western Weber Planning Area Properties from A-1 A-2 to R-3 & R1-15 (approved 03-19-2024).pdf 3/19/2024
Narrative
Revision Zoning Request Narrative.pdf 6/22/2023
Notice of Decision
Other
Staff Report – County Commission
Staff Report – Planning Commission
Revision WS1 - 12 SEP 2023 - ZMA2023-13 WWPC Memo - Ali Farms.pdf 9/6/2023
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

Charlie Ewert - 8/22/2023

Email sent to applicant 8/2/2023:

Got the concept plan. I looks good. A couple of minor changes/additions and I can get it on their next planning commission meeting for a public hearing. 

I like that the lot layout does not have specific measurements per lot. One thing I would like to see is dimensions on street blocks and pathway blocks so we can measure the 660-foot street block max and the 400-foot pathway max. I think generally the measurements are probably within the correct range, but I want to be sure. 

Also, I think there will eventually need to be a street connection through the D&C Farm property to the east that connects back to 4700 west. Just extending a stub  to the property on that northern bend should do the trick. Otherwise they will not be able to provide connectivity when they develop in the future. 

For the townhomes, I will be advocating for the ones next to 4700 to have fronts that face 4700, and have a maximum setback, not a minimum, from 4700. Same with townhomes 24-26; can you have them turned to face the street? The rear access looks good to me for the townhomes. 

Next steps for you so I can get this on for a hearing in September:

  • The application is still incomplete. We need you to submit(upload to Frontier) the following:
    • The concept plan (with the above addressed)
    • A neighborhood street connectivity plan. This plan will need to address possible street connections from within the project to land outside the project. It would be best to use the street regulating plan of the FB zone to show how the street layout of this concept plan can tie into the planned street layout. Or you can also show how the planned street layout should be changed to help provide better connections to this concept. 
    • A letter from the park district indicating their support for the project, and include a narrative explaining how you will voluntarily provide for the park district's needs as a part of this rezone.
    • A letter of acknowledgment from central weber sewer regarding the plan for sewer, including the pump station. Just acknowledgment. It does not need to be a will-serve letter. 
    • A letter of acknowledgment from Taylor West Weber Water indicating their knowledge of the requested rezone and their potential for service. . 
    • A letter of acknowledgment from an existing secondary water entity indicating their knowledge of the project and their potential for service. 

I suggest modifying the narrative to explain each of the above points. 

Marta Borchert - 7/27/2023

Invoice created, once fee is paid application can be accepted for review

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Fire - DR

Conditional

Weber Fire District David Reed Weber Fire District 7/31/2023

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options
Devron Andersen 7/27/2023
Marta Borchert 6/15/2023
Steve Burton 6/15/2023
chris cave 6/15/2023
Charlie Ewert 7/27/2023
Rick Grover 7/27/2023
Alec Hansel 7/27/2023
Gary Myers 7/27/2023
Jared Taylor 7/27/2023
David Reed Weber Fire District 7/27/2023
Tucker Weight 7/27/2023
Greg Wright 7/27/2023

Payments

List of all invoices tied to project.

16783 Paid 50.00 Receipt
17205 Paid 725.00 Receipt