Lowe-Matthew-Board of Adjustment

Address:
940 S. 9270 E, Huntsville, UT, 84317
Project Type:
Board of Adjustment
Sub Type:
Board of Adjustment
Created By:
Created On:
6/21/2022
Project Status:
Expired
Status Date:
10/10/2022
File Number:
BOA 2022-03
Project Manager

Application

Sunshine Valley Phase 3 consists of three (3) lots: Lot 204, Lot 301, and Lot 302. Lots 301 and 302 are nestled in between two (2) forks of the South Fork River. The physical characteristics of the land in which the lots are located require creativity and deviation from the current ordinances. The proposed and preferrable access to these lots is a shared driveway with access off of 850 S. Street just West past the county bridge. The engineered design of Lot 301 creates limited ability to adhere to the 100-foot setback from the driveway to each side of the fork of the river. The Utah well permit specifications also limits the overall design of the land use. The Property of lots 301 and 302 are bordered by both natural branches of the South Fork River which creates a unique and challenging area. Both forks at one point come within 200 feet of each other creating the request for the Variance. The alternative would be to access Lots 301 and 302 by constructing private bridges East of the county bridge. This would require (2) separate bridges and invasive disruption to the natural habitat in both locations. Two additional access points to/from 850 S. Street creates potential traffic safety concerns; ultimately leading to (3) separate access points along 850 S. Street as opposed to (1) Access point. Construction of the private bridges will require modification to the banks of the southern branch of the South Fork River in (2) separate locations. Natural erosion over the years becomes highly probable when the earth is moved or disturbed unnecessarily. To meet the 100-foot setback ordinance, multiple intrusive driveways would be required throughout the development for both residences rather than developing a cohesive shared driveway. Construction of the bridges compromises the overall integrity of the flood prevention work. According to the attached LOMR for Case No. 21-08-1088P, the area in question is deemed not to be a FEMA floodplain hazard. Our development is concerned about the environmental impact the construction of two bridges would have and is therefore: seeking a variance from the Board of Adjustment. We are requesting the Board of Adjustment approve a Variance to the Land Use Code in order to access Lots 301 and 302 with a shared driveway with a reduced setback from the southern branch of the South Fork River. The hardship imposed by the ordinance is 1) the disturbance of the natural environment and 2) the increased safety and potential traffic hazards of crossing multiple bridges and access points to 850 S. Street. Granting of the Variance will prevent significant disturbance of the natural environment and increase the safety of the lot owners and community.

Property Address
940 S. 9270 E
Huntsville, UT, 84317

Property Owner
Matthew Lowe
801-648-8229
steve@lowecompanies.com

Representative
Steven Droste
435-302-5868
steve@lowecompanies.com

False
FV-3
Sunshine Valley Estates
0
302 and 303
3.175 and 3.010
330 ft and 175.06 ft
Weber Basin Water Conservancy District
Not Applicable
Not Applicable
Representative, Steven E. Droste

Parcel Number
210230031 - County Map
210230039 - County Map
210230042 - County Map
211620004 - County Map

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Other
Revision BOA 2022-03 Notice of Decision.pdf 10/10/2022
Revision BOA minutes.pdf 10/7/2022
Original LOMR Letter 21-08-1088P-490187-CL.pdf 6/21/2022
Original LOMR 21-08-1088P-490187.pdf 6/21/2022
Original 2022.6.8 Sunshine Valley Phase 3.pdf 6/21/2022
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options
Marta Borchert 6/21/2022
Steve Burton 6/21/2022
Steven Droste 6/21/2022

Payments

List of all invoices tied to project.

14230 Paid 500.00 Receipt