Divine Ministries

Address:
3753 E 4100 N, Liberty, UT, 84310
Project Type:
Design Reviews
Sub Type:
Design Reviews
Created By:
Created On:
9/14/2015
Project Status:
Rejected
Status Date:
1/28/2016
File Number:
DR 2015-07
Project Manager

Application

Request to approve a church, school, and residential retreat for the disabled and elderly within an existing Single-Family Dwelling. The request would include a conversion of the home into a Ministerial retreat, where accommendatons could be provided for a short-term basis to various individuals, groups (religous or community based), and families. Retreats may include enjoyment of area recreational facilities such as skiing, boating, and golfing.

The proposed church, school, and residential retreat would provide a meeting and lodging location for groups seeking physical, spiritual, or emotional healing and recovery. The ministry will service and not discriminate nor exclude those with in an elderly or disbaled community.


Property Address
3753 E 4100 N
Liberty, UT, 84310

Property Owner

--

Representative

--

False
0
1
Liberty Pipeline
Septic
,

Parcel Number
220100053 - County Map

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Building Elevations
Engineered Plans
Landscaping Plan
Narrative
Notice of Decision
Other
Original 3753_E_4100_N.pdf 12/21/2015
Original DR_2015-07_Divine_Ministries_site-plan.pdf 9/14/2015
Original DR_2015-07_Divine_Ministries_landscaping_plan.pdf 9/14/2015
Original DR_2015-07_Divine_Ministries_septic_plan.pdf 9/14/2015
Original DR_2015-07_Divine_Ministries_exhibits.pdf 9/14/2015
Original DR_2015-07_Divine_Ministries_application.pdf 9/14/2015
Outdoor Lighting Plan
Planning Staff Report
Signage Plan
Site Plan
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

N/A - 1/28/2016
This application was terminated, as the owner has proposed and been permitted for a residential facility for disabled persons.
N/A - 12/21/2015
Two septic permits were found for this house. Ms. Sebaske is investigating where and if both systems are installed. Final bedroom count for the project will be determined by what is found.
Dana Shuler - 12/3/2015
I need to know the answers to Brandon's questions (9/19) before I can do a review. -Dana, Engineering Dept.
N/A - 11/19/2015
Please see my review for an email that was sent regarding this application.
N/A - 9/19/2015
I have many questions regarding this project. It would be very helpful to meet with the petitioner to clarify exactly how the building will be used. I cannot complete the review for this project until I have more information. It may be necessary to have a building floor plan which indicates where each type of use will be conducted. Some of the questions are: 1. Will there be a full time resident on site? 2. Is the school a full time school? 3. What ages are the children? 4. Where in the building will the school be located? 5. Will there be any child care (daycare type setting)?

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Planning Division Review

Not Approved

N/A N/A 11/19/2015
Environmental Health Septic and drinking water

Not Approved

N/A N/A 9/16/2015

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options
Stan Berniche 1/1/0001
Steve Burton 1/1/0001
Corinn Sebaske 1/1/0001
Dana Shuler 1/1/0001

Payments

List of all invoices tied to project.