Falcon Crest Subdivision Entry Gate

Address:
8900 E 1800 S, Huntsville, UT, 84317
Maps:
Project Type:
Conditional Use Permits
Sub Type:
Conditional Use Permits
Created By:
Created On:
8/22/2012
Project Status:
Approved
Status Date:
6/24/2013
File Number:
DR 2012-11
Project Manager

Application

Falcon Crest Subdivision is seeking approval to install a gate at the subdivision entrance for security purposes.


Property Address
8900 E 1800 S
Huntsville, UT, 84317

Property Owner

--

Representative

--

False
0
,

Parcel Number

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Building renderings
Easement documents
Engineered Plans
Geologic hazards study
Geotechnical report
Landscaping Plan
Narrative
Notice of decision
Other
Original DR_2012-11_Falcon_Crest_Entry_Gate_Land_Use_Permit.pdf 7/25/2013
Original Notice_of_Decision.pdf 9/27/2012
Review Exhibits.pdf 9/19/2012
Review PDF_Staff_Report.pdf 9/19/2012
Original Exhibits.pdf 9/19/2012
Original Staff_Report.pdf 9/19/2012
Original CUP2012-11_Entry_Gate_to_Falcon_Crest_Sub..pdf 8/22/2012
Permits issued
Planning staff report
Signage Plan
Site Plan
Time Extension
Water and Wastewater Plan
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

Sean Wilkinson - 6/25/2013
Land Use Permit #112-2013 was issued on June 24, 2013. The gate is required to be built in the location and with the same materials as shown on the approved site plan for DR 2012-11. The gate is required to have a knox box and knox switch as required by the Weber Fire District. Trash dumpsters or other equipment must be appropriately screened and secured.
Sean Wilkinson - 9/13/2012
This project was submitted as a Conditional Use Permit, but it will be processed as a Design Review. The file number will be DR 2012-11. The only difference is that the gate addition is a permitted use rather than a conditional use. The application will be heard at the September 25th Ogden Valley Planning Commission meeting.
Chad Meyerhoffer - 8/28/2012
I received an email from Brian Dehart addressing my review. This letter is a response to your review of the Falcon Crest Entrance Gate project. Concern # 1: The distance from 1800 South to the gate is not set and can be about any length required. Do you have a recommendation that will work? Concern # 2: The drainage will be on the west side if the road as it is now. A new culvert will replace the present smaller culvert. Concern # 3: I do not believe any county property or Right of Ways are affected by this project. Concern # 4: I think a permit will be required to install the new culvert. Concern # 5: Falcon Crest has requested 2 projects for Rocky Mountain Power; one is to remove existing unused power lines and equipment from the location and another to add power for the gate. Hopefully we can get a telephone line installed at the gate for communication and monitoring requirements. Regards, Brian President Falcon Crest HOA.

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Planning Division Staff Report

Approved

Weber County Community Development Sean Wilkinson 9/27/2012
Engineering

Not Approved

Weber County Engineering Chad Meyerhoffer 8/28/2012
Engineering

Not Approved

Weber County Engineering Chad Meyerhoffer 8/28/2012
Weber Fire District Review

Approved

Weber Fire District Ted Black 8/22/2012
Building Inspection Review

Approved

Craig Browne 8/22/2012

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options
Ted Black 1/1/0001
Craig Browne 1/1/0001
Brian DeHart 1/1/0001
Chad Meyerhoffer 1/1/0001

Payments

List of all invoices tied to project.