Bailey Acres Storm Drain

Address:
Approx 4700 N Hwy 162, Liberty, UT,
Maps:
Project Type:
Engineering Projects
Sub Type:
Engineering Projects
Created By:
Created On:
8/31/2011
Project Status:
Submitted
Status Date:
8/31/2011
File Number:
2011-13
Project Manager

Application

A storm drain pipe will be installed and a storm drain ditch will be constructed along the West side of Hwy 162 from the driveway at 4737 N and run, roughly 900 feet South. The purpose of this project is to protect the homes in this area and immediately North of here from future flooding by providing a path for the water.


Property Address
Approx 4700 N Hwy 162
Liberty, UT,

Property Owner

--

Representative

--

False
0
,

Parcel Number

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Other
Original Notice_of_Award_Signed.pdf 1/6/2012
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

N/A - 4/6/2012
Shawn came into the office this morning and said the project is complete and emailed me a final invoice. I will do my final inspection on Monday.
N/A - 3/30/2012
Site visit today, looks good. It's done, clean and just waiting for asphalt. Shawn mentioned trying to do asphalt Monday if the plant is open.
N/A - 3/22/2012
Shawn submitted is estimate for a final change order on the project. Jared has okay'd it as long as this is the last one. I'm waiting to hear back from Shawn on that.
N/A - 3/22/2012
Site visit today, all pipe has been installed, all utilities have been looped or relocated and the open ditch will be completed today. Asphalt plant don't open for another couple weeks, so the contractor will invoice for 2/3's of the project amount. They have final grading, clean up, 2 fences to repair and asphalt work left.
N/A - 3/20/2012
Site visit today, Questar has looped their 2 lines and last piece of pipe was being installed. Looks like the ditch construction and the intersection are what's left.
N/A - 3/14/2012
Shawn called this morning needing help contacting Questar about getting 2 lines looped. I gave him Mitch Campbell's number, he is the foreman for that area. Shawn has about 200' laid so far
N/A - 3/7/2012
Pre-construction meeting was held on site today. Notice to proceed will be issued today and construction will start on Monday March 12th
N/A - 2/29/2012
Pre-construction meeting has been set up for March 7th
N/A - 2/1/2012
After the flooding that recently occurred at this location, we have taken a second look at our design and have determined it is necessary to up size the pipe. I asked the contractor for a quote on the new pipe size and submitted that information to the county engineer for approval. He indicated that he will be calling the contractor directly to discuss the potential change order pricing.
N/A - 1/17/2012
PO #79557 has been approved by the County Commission for this project. A pre-construction meeting will be scheduled.
N/A - 1/11/2012
I received all of the required paperwork from Accurite Excavation today. Annette will take the PO to the Commission on Tuesday.
N/A - 1/9/2012
I sent Shawn Durrant, Accurite Excavation, a reminder email today about their paperwork being due tomorrow. I listed everything I needed and told him it needed to be turned in by the end of the day tomorrow so I could get him approved through the County Commission.
N/A - 1/6/2012
Shawn came in Jan 4th to discuss the necessary paperwork and time frame. He indicated that he will be able to start the job February 15th and it would take him 2 weeks. I agreed to that as a start date and asked him to get his paperwork in asap so I could get him approved by the Commission. He will be bringing in the signed PO Agreement, Performance Bond, Certificate of Insurance and signed Notice of Award.
N/A - 1/4/2012
Sent Notice of Award to Accurite Excavation yesterday. They have until the 10th to get their paperwork turned in.
N/A - 12/29/2011
Bid opening was held today. The apparent low bidder was Accurite Excavation. Bids are being analyzed and a decision will be made in a few days.
N/A - 12/14/2011
Bid package was sent up to purchasing today. The project is estimated to be around $13,000 so we will not be advertising it. I provided Annette a list of 12 local companies to send an invitation to bid to. The bid opening will be held December 29th at 2:00.
N/A - 12/13/2011
Mike Tuttle and I had a meeting with Chris Allred last Friday to review out contract documents and bid packages. As a result of that meeting, I am revising my contract document prior to sending them up to purchasing.
N/A - 12/7/2011
Bid package is completed, pending review by the county engineer.
Michael Tuttle - 11/15/2011
Talked to Nate Pierce today, 2011-11-15, and he said to go ahead and get the work bid out and completed. We'll be paying for it out of the Stormwater Fund.
N/A - 10/6/2011
Project is on hold pending the final budget.
N/A - 9/13/2011
Received 2 of the 3 estimates today, looks like I need to prepare a bid package and put this project out to bid being as the estimates have back over $5,000.
N/A - 9/12/2011
9/2/2011 I emailed 3 contractors a copy of my drawings as well as an estimate form. I'm trying to see how much this project will cost so I know if I need to send it out to bid or not. 9/8/2011 I hadn't received anything back from them so I emailed them again asking for a response by 9/12/2011.
N/A - 8/31/2011
Design completed, quantities calculated, emailed to 3 contractors for estimates today.
N/A - 8/31/2011
The design is currently underway.

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options
Michael Tuttle 1/1/0001