Nordic Valley Dr Culvert

Address:
2750 N 67350 E, Liberty, UT, 84310
Maps:
Project Type:
Engineering Projects
Sub Type:
Engineering Projects
Created By:
Created On:
8/21/2012
Project Status:
Submitted
Status Date:
10/3/2012
File Number:
2012-12
Project Manager

Application

This project is to remove the existing 36" cmp under Nordic Valley Drive which has collapsed and replace it with a new HDPE pipe.


Property Address
2750 N 67350 E
Liberty, UT, 84310

Property Owner

--

Representative

--

False
0
,

Parcel Number

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Other
Original Nordic_Bonds.pdf 11/5/2012
Original po_agreement.pdf 10/16/2012
Original Cert_of_Ins_-_Weber_County.pdf 10/15/2012
Original Nordic_Valley_Notice_of_Award.jpg 10/9/2012
Original abstracts_of_bids.pdf 10/4/2012
Original ormond.pdf 10/3/2012
Original wasatch_west_contracting.pdf 10/3/2012
Original dennis_lierd.pdf 10/3/2012
Original accurite.pdf 10/3/2012
Original assoc._brigham_contractors.pdf 10/3/2012
Original project_sheet.pdf 10/3/2012
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

N/A - 8/14/2013
Project is complete and looks great! Questar & Rocky Mountain Power still need to come in and finish with their utilities.
N/A - 7/15/2013
Road closure set for today. RMP will start their portion the 17th followed by Century Link, Questar Gas and Nordic Valley Water
N/A - 6/5/2013
RMP didn't show up to the meeting they set up with us for today at 10, a new meeting has been set up with them for tomorrow at 2
N/A - 11/7/2012
Due to the road having to be open 40' and utilities suspended, Rocky Mountain Power is concerned and has issued us work order #5720705. I will be calling them to set up a meeting. In the meantime, the contractor has been on site trying to punch a 12" di pipe through the existing culvert in order to get drainage through winter and runoff season. We will complete this project in the spring after we've been able to make the utility companies happy.
N/A - 11/5/2012
I have now received the required paperwork on this project. The pre-construction meeting will be held today on-site and the Notice to Proceed will be issued by the end of the day.
N/A - 11/2/2012
I sent e-vites yesterday for a pre-construction meeting today at 3:00
N/A - 10/15/2012
I sent Shawn an email today to remind him that his paperwork (certificate of liability insurance, performance bond, payment bond and signed purchase order agreement) is due today by 5:00.
N/A - 10/4/2012
Project was awarded to Accurite Excavating today for a contract price of $29,000
N/A - 9/19/2012
Bid opening is October 3rd
N/A - 8/21/2012
drawings and bid documents are done, waiting on engineering to review before sending gout to bid

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options