Combe Residence

Address:
2670 Bybee Dr., Uintah, UT, 84404
Maps:
Project Type:
Storm Water Construction Activity Permit
Sub Type:
Storm Water Construction Activity Permit
Created By:
Created On:
11/21/2017
Project Status:
Submitted
Status Date:
11/21/2017
File Number:
2017-95
Parent Project:
Project Manager

Application

Common Plan SWPPP

 


Property Address
2670 Bybee Dr.
Uintah, UT, 84404

Property Owner

--

Representative

--

False
0
,

Parcel Number

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Other
Original Swppp_Inspection_1-24-18.pdf 1/24/2018
Original 2017-11-28-BWF-Combie.pdf 11/28/2017
Original Combe_-_swppp-information_pdf.pdf 11/21/2017
Original SWCAP_and_NOI.pdf 11/21/2017
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

Blane W Frandsen - 11/27/2017
We are clearly into the wet fall and winter months. It is encouraged that the dumpster be covered to restrict storm water from entering into the container and leaking out onto the ground. Sanitary waste should be contained in a porta-potie and not into a dumpster or trailer. Although the portion of the work to be performed by Notting Hill Homes does not include landscaping it will be required that the final stabilizing by landscaping and or hardscaping be performed before a notice of termination NOT can be approved for the proposed development. A formal transfer of the responsibilies of the SWPPP to either the owner or landscape contractor will need to occur. It is encouraged that a construction schedule be provided noting when various BMP's will be implemented other wards all BMP's will need to be inplace before construction starts and maintained until construction is completed. As we go into the winter months will the construction shut down. If such is anticipated it should be noted in the SWPPP otherwise weekly inspections will have to continue throughout the winter months. The weekly inspections to be provided by contractor as a permit requirement need to be recorded in writing and should be communicated to the county either by email of FAX. Blane W. Frandsen PE

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options
Jonathan Arrington 1/1/0001
Braden Felix 1/1/0001