North Fields at Little Mountain

Address:
7805 W 900 S, West Warren, UT, 84404
Project Type:
Subdivisions
Sub Type:
Subdivisions
Created By:
Created On:
1/18/2012
Project Status:
Approved
Status Date:
11/21/2013
File Number:
LVN011812
Project Manager

Application


Property Address
7805 W 900 S
West Warren, UT, 84404

Property Owner

--

Representative

--

False
0
0
0
3
West Warren-Warren Water & Sewer
Warren Irrigation Company
Septic
,

Parcel Number
100430066 - County Map

Building Description Square Feet Valuation

Contractor Type Name Contact Address


Documents

List of project documents. Review documents can be found under the Review tab.

Document Name Date Uploaded
Options
Annexation Plat
Application
Attestation
Cost Estimate
Culinary Water Will-Serve
Engineered Plans
Final Recorded Plat
Geologic Hazards Evaluation
Geotechnical Evaluation
Notice of Decision
Open Space Preservation Plan
Other
Original pipe_receipt.pdf 9/4/2013
Original excavation_permit.pdf 9/4/2013
Original revised_plat_for_North_Fields_at_Little_Mountain.pdf 11/20/2012
Original north_fields_pp.pdf 5/14/2012
Original Plat.pdf 1/20/2012
Original Application.pdf 1/18/2012
Preapplication Meeting Notes
Proposed Final Plat
Proposed Preliminary Plan
Public Street Connectivity Plan
Receipt
Response to Review Agencies
Secondary Water Will-Serve
Septic Feasibility
Sewer Will-Serve
Staff Report
Time Extension
Title Report
Traffic Study/Plan
Well Approval
Uncategorized Documents

Comments

Have a question? Leave a comment, your comment will be emailed to all project followers.

N/A - 10/11/2013
I left a message for Dallas to return my call to allow permission to change the name of the developer on the mylar from Cliff Bell to Mark and Anna Bennett. Health and Surveying have already signed the plat. Only Engineering and Planning are left to be done before recording.
N/A - 9/24/2013
The Mylar has come back the Planning and has been sent out to Health and Engineering.
N/A - 9/10/2013
Anna came in today and paid $300.00 for a one year time extension.
N/A - 9/3/2013
I briefly spoke to Ben from Planning about this project this morning, he mentioned that it may be nearing the expiration date. Anna, you may want to touch base with him to be sure the status of this
N/A - 8/30/2013
I received a call from Anna today letting me know they have purchased the pipe and she will be getting her receipt to Kelly.
N/A - 3/1/2013
I received a new plat via email. I posted it to Miradi and wrote a new review.
N/A - 2/8/2013
I received a phone call from Anna today. She has recently purchased the property and called to find out what she needs to do to get the project done so she can start building her home.
N/A - 12/27/2012
Engineering hasn't seen any improvements plans for this project.
N/A - 12/27/2012
I see that the Fire District is requiring a fire hydrant, has one been shown in the improvement plans along with the water line extension? Water lines and hydrants are typically built in the ROW and should be reviewed by Engineering before installation.
N/A - 11/20/2012
A new plat has been submitted for this project. This property has been sold to new owners who would like to continue this application and build a home ASAP. Please review that nothing has changed since the printed mylar, and re-list any outstanding requirements needed for approval.
N/A - 5/21/2012
I have the mylar, waiting for other items to be addressed before asking the County Engineer to sign it
Justin Morris - 5/8/2012
Ben Hatfield is now the project manager for this project.
N/A - 4/16/2012
Ken Buie called today wanting an update as to the project status. I emailed him my last review letter, he is going to touch base with Doug at Landmark.
N/A - 4/6/2012
I spoke to Cliff Bell this morning, he was under the impression the deferral for curb, gutter & sidewalk had been granted. I asked Justin about it and he said it has not been granted but is recommended to be granted. Cliff will talk to Landmark about getting elevations put on the preliminary plan for the entire site. He also said the required pipe for the ditch along the road will be handled by Kent Buie.
N/A - 4/4/2012
I received another plat on this project and have discussed this project with Jared. I need to also discuss it with Chad because I'm unsure as to how to help move this project forward being as I'm not getting a response to my review and keep getting a plat brought in for me to review.
N/A - 3/27/2012
Ken Bui called today to ask for an update on the status of the project. I let him know that I am waiting for a preliminary plan. He was going to call Cliff Bell and Landmark and try to get it for me.
N/A - 3/20/2012
I have a mylar for this project on my desk prematurely. I can't ask the county engineer to sign it without my review comments addressed.
Justin Morris - 3/16/2012
Received Mylar from Surveying and took it to Engineering for their signature.
Jack Haight - 3/13/2012
A second Mylar is required to be filed as a record of survey. I called Doug today to inform him as to such
Justin Morris - 3/5/2012
Received Mylar from Cliff Bell. Took it to Surveying for their signature.
N/A - 3/2/2012
Cliff Bell brought in a plot plan of lot 1 for me to review as the SWPPP. I emailed him directly giving him the copy of the applicable storm drain ordinance as well as a copy of the SWPPP check list to aid him in finishing the SWPPP.
Jack Haight - 1/24/2012
Printed and scheduled for review
Scott Slater - 1/23/2012
Questar Gas has facilities on North side of 900 South to possibly serves a small subdivision. For details contact QGC
Sue Morgan - 1/19/2012
All students are eligible for busing. We currently have bus stops in that area on 900 S.
Karl Sewell - 1/19/2012
RMP has facilities on 900 south - project is possible. Specfics to work out with property owner.

Reviews

To access review documents, click on the individual review and the corresponding review documents will be listed under the review.


List of All Reviews

Health Dept-Wastewater

Approved

Weber-Morgan Health Department Summer Day 10/30/2013
Engineering Review 5

Approved

N/A N/A 9/4/2013
Engineering Review 4

Not Approved

N/A N/A 3/1/2013
Engineering Review 3

Not Approved

N/A N/A 11/28/2012
Delinquent Property Taxes

Approved

Carolyn Laird 6/20/2012
Engineering Review 2

Not Approved

N/A N/A 4/4/2012
Property Taxes

Not Approved

Carolyn Laird 1/30/2012
Engineering Review 1

Not Approved

N/A N/A 1/24/2012
Preliminary Review

Approved

Leann Kilts 1/23/2012
Fire Review

Approved

Weber Fire District Ted Black 4/16/2013

Followers

All followers will be notified of new documents, comments, and reviews to the project.

Name Date Added
Options
Nick Anderson 1/1/0001
Cliff Bell 1/1/0001
Ted Black 1/1/0001
Anna Bravard 1/1/0001
Kent Buie 1/1/0001
Summer Day 1/1/0001
Jack Haight 1/1/0001
Leann Kilts 1/1/0001
Carolyn Laird 1/1/0001
Justin Morris 1/1/0001

Payments

List of all invoices tied to project.

Area Fees

List of estimated fees for this project.

Estimated Fee Total: $0